1, high pressure grouting machine will be inserted before the power supply to confirm that the switch is in the closed position.
2, when the new machine has just been used, please use the oil into the machine material cup, turn on the power cycle again, play oil.
3, the fuselage and the surrounding with soft cloth can be used to wipe the oil.
4, single liquid type PU water proof agent directly into the material cup, cover the cup cover.
5, the opening of the switch valve plate (open) open state, the filling head should be aligned with the garbage can, turn on the power switch, the remaining oil in the pipe to play out of the slurry.
6, the filling head alignment perfusion needle insertion force butter tight, righting the first open perfusion switch, then open the power switch, will continue to inject slurry pressurized structure in the body, from the surface until the slurry overflow until then turn off the power switch, and then close the valve on the perfusion switch, swing off pull loose.
7, after the completion of all construction must be immediately to the special cleaning agent into the machine in the cup, the tube cleaning agent to play the remaining chemicals until then ejected, perfusion switch into the material cup, continuous valve switch several times, the 200kg pressure in the tube wall, so easy to clean, wash for about 3-5 minutes, the filling machine cleaning agent is sprayed out of the garbage can, after spray, and then pour the oil cup cycle maintenance, and keep the oil free slurry residue machine in the tube wall, resulting in clogging. Technical index: